Industry News

The world's first 1.24 million kilowatt high-efficiency ultra-supercritical coal-fired power generation project completed and put into operation

date:2020-07-20 15:16:45    

  At 10 o'clock on July 17, Guangdong Huaxia Yangxi Power Plant Unit 5 and Unit 6 (2×124 million kilowatts) project, which was surveyed and designed by China Energy Construction Guangdong Institute, Guangdong Thermal Power was responsible for construction and installation, and Broadcasting and Television Engineering Bureau was responsible for civil construction 6 Unit No. 2, successfully completed the 168-hour full-load trial operation. Prior to this, Unit 5 had completed a 168-hour full-load trial operation on July 7. So far, the project has been fully completed and put into production.

  The project is a 1,240 MW high-efficiency ultra-supercritical coal-fired unit with the largest single-shaft full-speed single-unit capacity, the highest steam parameters, the lowest unit power generation coal consumption, and the lowest unit pollution emissions among the domestic units that have been put into operation. It is a green thermal power benchmarking demonstration project.

  The Guangdong Institute innovated and applied compact in-line flue layout, high-efficiency regenerative system, spring vibration isolation platform system of turbine base, non-powered dust removal, "pretreatment + TMF + STRO + DTRO" desulfurization wastewater zero discharge treatment in this project , Combined treatment of flue gas, etc., with the help of advanced three-dimensional collaborative design technology, fieldbus technology and computer network information technology to comprehensively improve the automation level of power plant operation and management.

  During the construction of the project, the Guangdong Thermal Power and Broadcasting Engineering Bureau scientifically allocated resources, optimized the construction plan, strengthened construction management, promoted the construction of the project under the premise of ensuring safety and quality, and completed multiple milestones in a safe, environmentally friendly, scientific and efficient manner.

  It is understood that the indicators of the project in terms of safety, environmental protection, energy efficiency, etc. are all at the highest level in the world for thermal power units. The units have broken through foreign technical restrictions in terms of parameters, capacity, and modular design, and have completely independent intellectual property rights. 28 patents have been authorized, and the overall localization rate is over 90%. The successful implementation of the project is also a comprehensive test for the design, manufacture, construction and operation of my country's large-capacity, high-parameter ultra-supercritical power plants to a new level.


Contact Us

Resolve Your Problems within One Minute

xinli whatsapp

WhatsApp:0086-13803825084

wechat

WeChat

xinli company address

Address:No.11 Minhe Road, Private Industrial Park, Development Zone, Kaifeng City

Inquiry

If you have any questions about our company and products, please contact us immediately. Any inquiries and Suggestions would be appreciated.
We will keep your information confidential.

Power or Capacity: